Skip Main Navigation

Search



Results Showing 41 - 60

400 results found for " street signs lane"

If you cannot find what you need please visit Ask Arvada to explore topics and contact the City of Arvada.

Adopt-a-Street
Updated

. The City provides trash bags and safety vests, and will collect the filled bags when the volunteers have completed the litter pickup. Signs are posted on the adopted streets to recognize the efforts

W.  58th Ave.  between Garrison and Independence: Lane Reductions begin Thursday Oct. 4
Updated

Lane reductions will occur in the section of W. 58th Ave. between Garrison St. and Independence St. beginning Thursday, October 4 for an asphalt project. Work will occur between the hours

Arvada’s Annual Bike to Work Day
Updated

bikeways and 56 miles of on-street bike lanes. Arvada's bicycle infrastructure and the City's ability to manage it properly has resulted in a Bike Friendly Community designation by the League of American

Voters Approve Ballot Issue 3F
Updated

Oak St. In addition to adding capacity, the project will also add bike lanes for cyclists and sidewalks for pedestrians to safely travel along the corridor. The W. 72nd Ave. project will also provide

3F Bond Authorization Projects (Two Big Projects)
Updated

Image for
. will deteriorate with the build-out of the City, and roadways will perform at the lowest levels of service. Ralston Road Project: Yukon St. to Garrison St. Narrow lane width creates safety

Development Projects Interactive Map
Updated

Image for
, such as minor modifications, vacating street or sidewalk right-of-way, and some site plan reviews are not included in the lists. Properties that are under review and pending approval through a public hearing

Engineering
Updated

protection and flood insurance . A part of the Engineering Division, City of Arvada’s Traffic and Transportation operations installs, operates and maintains street markings, signs, traffic signals and other

Developments in Arvada
Updated

Current Projects Are you looking for residential and commercial development projects being processed by the City? Did you see a public hearing sign? Review our Development story map for more

Curb, Gutter, and Sidewalk Maintenance
Updated

will determine if the sidewalk, curb and gutter meets the replacement criteria. If it does, the work will be added to the database, and you will be eligible to sign up for the program. How Much Will it Cost

Skyline Park Parking Lot Closed During Construction Project
Updated

to the parking lot itself. Please note: Most street parking in that area is "by permit only" during daytime hours. Therefore, if you plan to visit Skyline Park and you do not live within walking distance

Our Waterways: How Can You Help?
Updated

to pick up litter on a chosen route four or more times a year. The City posts a sign with your name on it. Contracts are two years and can be extended for more. Visit Adopt-A-Street for more information

Dry Utility
Updated

Before You Apply Prior to applying for a permit, any person planning to excavate in the City's right-of-way shall review the City's Construction Projects and Street Cut Moratorium maps listed

May 21, 2014 - Arvada Designated a Bicycle Friendly Community by the League of American Bicyclists
Updated

Friendly Community at the Bronze level in 2008. The City has 125 miles of off-street facilities and 56 miles of on-street facilities; in addition, 65% of arterial streets include bike lanes for cyclists

Additional Trails
Updated

Image for
the south edge of Rocky Flats National Wildlife Refuge west from Indiana Street to a trailhead at W. 95th Lane west of Poppy Way. A connection bearing south to Big Dry Creek Trail is available from

Sign Application (PDF) Sign Application (PDF)
Updated

A content preview is not available for this item.

Sign Application (PDF) Sign Application (PDF)
Updated

A content preview is not available for this item.

Campaign Sign Rules (PDF) Campaign Sign Rules (PDF)
Updated

A content preview is not available for this item.

Political Campaign Sign Placement (PDF) Political Campaign Sign Placement (PDF)
Updated

A content preview is not available for this item.

Jan 2,  2007:   Arvada Recovers from Back-to-Back Storms
Updated

one lane, safely navigable by a vehicle with regular snow tires), but residents should not expect streets to be plowed to asphalt. Residents can call the City's snow line at 720-898-7725

Utilities Project Updates
Updated

Image for
Update June 2019: Water, Sewer and Storm Projects Water Simms Street 24" Water Transmission Main This project involves installation of a 24" water transmission in Simms Street between 70th