Skip Main Navigation
City Facilities Delayed Opening 12/12 City facilities will have a delayed opening on Thursday, Dec, 12 for an internal function. Our offices will be open for business at 9...

Search



Results Showing 21 - 40

380 results found for " street signs lane"

If you cannot find what you need please visit Ask Arvada to explore topics and contact the City of Arvada.

Ralston Creek Corridor Sewer
Updated

Project Overview A 12,000 linear foot sewer line will be installed in the Ralston Creek corridor between Independence Street and Simms Street. This capital improvement project will replace

Alkire Street Closure Between 88th & 96th Aves.
Updated

The City of Westminster will be replacing a storm culvert at Alkire Street between 88th and 96th Avenues and will require the closure of Alkire Street. The closure will begin Monday, October 2

Capital and Maintenance Improvement Projects
Updated

Description Cost CIP UPRR Quiet Zones - Lamar Street, Olde Wadsworth Boulevard, Carr Street, and W. 66th Avenue and new traffic signals at Carr Street and W. 66th Ave

Roadway Work on Sheridan to Begin Mid-September (52nd - 58th Aves)
Updated

) between 52nd Avenue and 58th Avenue. Work includes curb ramp accessibility improvements, sidewalk replacement, street light installation, traffic signal improvements and an asphalt overlay. This project

W 72nd Avenue Closed Due to Gas Leak
Updated

UPDATE 8:45 am Tuesday November 26, 2019 W 72nd Avenue is open. The situation has been resolved. UPDATE 4:15 pm There is one lane open on W 72nd Avenue. Traffic is flowing well

Pavement Surface Treatment Types
Updated

-10 years. Complete Reconstruction of Sub-Base and Asphalt Cost: $285,648 per lane mile A complete reconstruction is a long term, but extremely expensive repair to the street. It provides

2016 Election Results
Updated

Image for
OF STREET MAINTENANCE, STREET IMPROVEMENTS, AND SIDEWALK IMPROVEMENTS PROVIDED THAT THE FOLLOWING PROJECTS SHALL BE FUNDED BEFORE ANY OTHERS ARE FUNDED: WIDENING EXISTING LANES AND IMPROVING SIDEWALKS

Signs
Updated

New Sign Code Regulations Sign regulations are “content-neutral;” Classification of signs are based on structure, materials, components and durability, lighting, number, height, area

Construction Work on Indiana Near New King Soopers
Updated

Construction in the vicinity of Candelas Pkwy and Indiana Street near the new King Soopers is related to infrastructure being built by the King Soopers developer. The project is not a City project

Roads and Transit
Updated

, please check out Public Transit in Arvada. Street Safety and Traffic Control Whether you are looking for information about traffic control on your street or signs and signals in Arvada, you'll find

Public Works Department
Updated

. This department maintains more than 1,440 lane miles of paved streets, virtually 1,000 miles of curb, gutter, sidewalks and medians, about 2,300 storm and irrigation ditches, and nearly 600,000 square feet

Candelas Development Parks Update, April 2014
Updated

streets, with signage for trail identification and rules and regulations. The first section of the trail is completed from the trail underpass at Candelas Parkway west to the next underpass at 95th Lane

Adopt-a-Street
Updated

. The City provides trash bags and safety vests, and will collect the filled bags when the volunteers have completed the litter pickup. Signs are posted on the adopted streets to recognize the efforts

W.  58th Ave.  between Garrison and Independence: Lane Reductions begin Thursday Oct. 4
Updated

Lane reductions will occur in the section of W. 58th Ave. between Garrison St. and Independence St. beginning Thursday, October 4 for an asphalt project. Work will occur between the hours

Arvada’s Annual Bike to Work Day
Updated

to ride. About Arvada's Bike System The City of Arvada boasts 125 miles of off-street bikeways and 56 miles of on-street bike lanes. Arvada's bicycle infrastructure and the City's ability to manage

Voters Approve Ballot Issue 3F
Updated

Oak St. In addition to adding capacity, the project will also add bike lanes for cyclists and sidewalks for pedestrians to safely travel along the corridor. The W. 72nd Ave. project will also provide

3F Bond Authorization Projects (Two Big Projects)
Updated

Image for
. will deteriorate with the build-out of the City, and roadways will perform at the lowest levels of service. Ralston Road Project: Yukon St. to Garrison St. Narrow lane width creates safety

Engineering
Updated

protection and flood insurance . A part of the Engineering Division, City of Arvada’s Traffic and Transportation operations installs, operates and maintains street markings, signs, traffic signals and other

Curb, Gutter, and Sidewalk Maintenance
Updated

will determine if the sidewalk, curb and gutter meets the replacement criteria. If it does, the work will be added to the database, and you will be eligible to sign up for the program. How Much Will it Cost

Skyline Park Parking Lot Closed During Construction Project
Updated

to the parking lot itself. Please note: Most street parking in that area is "by permit only" during daytime hours. Therefore, if you plan to visit Skyline Park and you do not live within walking distance