Skip Main Navigation

Search



Results Showing 21 - 40

400 results found for " street signs lane"

If you cannot find what you need please visit Ask Arvada to explore topics and contact the City of Arvada.

Street Safety and Traffic Control
Updated

Speed limits, traffic signs, and traffic signals are important elements of both street safety and traffic control. Check out Traffic Control on My Street to get answers to common questions

Indiana Street at UPRR Widening Project
Updated

Image for
and address congestion on SH-72 (Indiana Street) from W. 80th Ave. to W. 86th Pkwy. by adding travel lanes (capacity). While reconstructing the roadway, the project will also add bicycle lanes for cyclists

Signs
Updated

Sign Code Regulations: The rules and regulations for signs within the City of Arvada are found in the Arvada Land Development Code (LDC). Any sign that is visible from any street or adjacent

Construction Activity at G Line Platform on Grandview
Updated

Beginning Monday, July 17, a contractor will be working near the G Line platform On Grandview Ave. just west of Webster Street. There will be no road closures associated with this work; however

Xcel Energy Project on West 64th Ave. Corridor
Updated

lane closures on W. 64th Ave. and detours for three intersections on W. 64th Ave, Yank Way, Youngfield Street and Arbutus Street. Travel delays during night work. Please plan alternate routes

Gas Line Work on Carr Street
Updated

Xcel Energy's contractor, Q3 Contracting, is replacing a gas main along the Carr Street alignment from I-70 to W. 88th Avenue. Line replacement began in August 2016 and is anticipated

Common Code Questions
Updated

than 8 feet, a truck tractor or semi-trailer regardless of size (does not include RVs). Signs Signs cannot be posted on any city right-of-way. This includes street signs, utility poles, and medians

Projects Along the W 58th Ave Corridor Between Kipling Street and Ward Road
Updated

: ● Adding turn lanes and reconstructing the signal at Ward Road and W. 58th Ave. intersection for traffic safety and reduction of congestion. This project is grant funded. ● Revising the unsignalized full

Alkire Street Closure Between 88th & 96th Aves.
Updated

The City of Westminster will be replacing a storm culvert at Alkire Street between 88th and 96th Avenues and will require the closure of Alkire Street. The closure will begin Monday, October 2

Capital and Maintenance Improvement Projects
Updated

Description Cost CIP UPRR Quiet Zones - Lamar Street, Olde Wadsworth Boulevard, Carr Street, and W. 66th Avenue and new traffic signals at Carr Street and W. 66th Ave

Roadway Work on Sheridan to Begin Mid-September (52nd - 58th Aves)
Updated

) between 52nd Avenue and 58th Avenue. Work includes curb ramp accessibility improvements, sidewalk replacement, street light installation, traffic signal improvements and an asphalt overlay. This project

W 72nd Avenue Closed Due to Gas Leak
Updated

UPDATE 8:45 am Tuesday November 26, 2019 W 72nd Avenue is open. The situation has been resolved. UPDATE 4:15 pm There is one lane open on W 72nd Avenue. Traffic is flowing well

Pavement Surface Treatment Types
Updated

-10 years. Complete Reconstruction of Sub-Base and Asphalt Cost: $285,648 per lane mile A complete reconstruction is a long term, but extremely expensive repair to the street. It provides

Roads and Transit
Updated

check out Public Transit in Arvada. Street Safety and Traffic Control Whether you are looking for information about traffic control on your street or signs and signals in Arvada, you'll find

2016 Election Results
Updated

Image for
OF STREET MAINTENANCE, STREET IMPROVEMENTS, AND SIDEWALK IMPROVEMENTS PROVIDED THAT THE FOLLOWING PROJECTS SHALL BE FUNDED BEFORE ANY OTHERS ARE FUNDED: WIDENING EXISTING LANES AND IMPROVING SIDEWALKS

W. 72nd Avenue Bond Project
Updated

Image for
on this page. Sign up to receive periodic project updates via email. Project Update The City will be using an alternate contracting method, called Construction Manager/General Contractor (CM/GC

Construction Work on Indiana Near New King Soopers
Updated

Construction in the vicinity of Candelas Pkwy and Indiana Street near the new King Soopers is related to infrastructure being built by the King Soopers developer. The project is not a City project

Street Parking in Olde Town
Updated

Rules for Street and Lot Parking in Olde Town Posted time restrictions are in effect from 8 a.m. to 7 p.m. Once the time expires your vehicle must move a minimum of 500 feet from your

Public Works Department
Updated

. This department maintains more than 1,440 lane miles of paved streets, virtually 1,000 miles of curb, gutter, sidewalks and medians, about 2,300 storm and irrigation ditches, and nearly 600,000 square feet

Candelas Development Parks Update, April 2014
Updated

streets, with signage for trail identification and rules and regulations. The first section of the trail is completed from the trail underpass at Candelas Parkway west to the next underpass at 95th Lane