Arvada K-8 School Park Improvements Public Meetings

The master plan was developed over an approximately 6 month period.  Three neighborhood meetings were held to develop the final master plan document.  Meetings were held at the K-8 School on April 6, April 20 and May 18, 2011.  In addition, staff and representatives from DHM Design Corporation met with approximately 30 school students to discuss the project and get their ideas and input. Three original design concepts were shown at the first meeting and discussed further at the second meeting.  The ideas generated at the meetings were consolidated into a conceptual master plan that was shown at the final meeting on May 18, 2011.  The comments of the students, the neighborhood residents and the school district were consolidated into the final master plan which was finalized after the third meeting.  Development of the construction drawings and bid documents is underway and will be completed this summer.  The project will then be put out to bid.  The construction schedule will be determined working closely with the school district.

Call Mike Lee, City of Arvada (720) 898-7390 for more information.