Single Family/Duplex/Townhome Permit Requirements

4-Plot Plans/8-1/2" x 14" Maximum size.

2-Building Plans/Complete structural, elevations & braced wall lines must be specified on plans.

2-Basement structural floors with ventilation and moisture mitigation plan.

2-Foundation Plans stamped by a Colorado Professional Engineer.

2-Truss packs stamped -105 Exp-C 30lb snow roof.

1-Rescheck www.energycodes.gov if doing total UA design for energy code compliance.

1-Hers rating performance design for energy code compliance.

1-Drainage Plan with contours separate from site plan.

1-Heat Calculations/Manual J and D.

1-Application filled out completely.

1-Soil Report.

Unless otherwise noted by building department that the building could be Exposure C.

 

All documents must be filled out completely and submitted with permit application or the permit will not be accepted. Custom Home Plans will require that the Plan Review Fee is paid when the permit is dropped off for review. Permits require 2- 4 weeks for repeat plans and 4- 6 weeks for custom or master plans/approximately.

Any delay in your reply to our questions will affect the time to get any permit approved.